GM Erich Peterson, PE, updates Township Board of Directors on Bear Branch Dam

Woodlands Water GM Erich Peterson, PE, presented updates on Bear Branch Dam to The Woodlands Township Board of Directors. Erich reported that the MUDs have approved full funding for the design phase of the Bear Branch Dam modification project, ensuring the entire scope can now move forward. The Township Board also approved a letter of […]
Employment Opportunities

Multi-year project ensures spillway safety; final funding sought THE WOODLANDS, Texas, September 25, 2025 –- The 40-year-old Bear Branch Dam spillway in The Woodlands remains strong and well maintained, and a pending multi-year rehabilitation project will keep it that way, The Woodlands Water Agency said today. A recent study by Schnabel Engineering, a national firm […]
Bear Branch Dam Renewal Efforts Underway

Multi-year project ensures spillway safety; final funding sought THE WOODLANDS, Texas, September 25, 2025 –- The 40-year-old Bear Branch Dam spillway in The Woodlands remains strong and well maintained, and a pending multi-year rehabilitation project will keep it that way, The Woodlands Water Agency said today. A recent study by Schnabel Engineering, a national firm […]
C&D Lead – Ditch

Download PDF Job Title: C&D Lead – Ditch Department: Operations Reports To: Asst Superintendent Directly Supervises: 3 FLSA Status: Non-Exempt Date Revised: September 4, 2025 Position Type: Full Time Location: WWA Field Office POSITION SUMMARY: The Ditch Tech Lead performs work related to the maintenance, repair, and construction of the District’s large ditch and stormwater systems. This position is responsible for excavating, installing, […]