6/14/2022 Update: SJRA contractor repaired the 12” PVC line this morning at approximately 8:00 am. An insertion valve (plug valve) was installed and necessary valves opened to flush the line. Service will be restored. Samples will be pulled as a precaution and sent to the lab for testing.